CЦ-28 1 Unit
is designed for mud preparation when drilling oil and gas wells.
Unit includes:
1. Tank V=30 m3 - 1 piece
2. Clay mixer - 1 piece
3. Mixer СМ-100 - 1 piece
4. Mud agitator ПБР-Т 7,5 - 4 pieces
5. Pump ГШН-150М - 1 piece
6. Cover frame - 1 piece
7. Cover( shelter) - 1 piece
8. Distribution device - 1 piece
9. Control cabinet - 1 piece
10. Connecting hosepipes - 1 piese
11. Pipe manifold with regulation
and distribution roads - 1 piece